Place: South-west of Ålesund
Project description:
- Concrete bridge between Nerlandsøya and Bergsøya
- 574m long, 11,5m wide
- Methods: Moveable Scaffold System (MSS) and balanced cantiliver (fritt frembygg - FFB)
- Concrete 11.000 m3
- Reinforcement 1.920 tonnes
- Project value client MNOK 443
Arctic deliveries:
- Concrete workers
- Manitou operators